nut/docs/man/oneac.8
2011-06-01 22:31:49 +02:00

82 lines
2.6 KiB
Groff

'\" t
.\" Title: oneac
.\" Author: [see the "AUTHOR" section]
.\" Generator: DocBook XSL Stylesheets v1.75.2 <http://docbook.sf.net/>
.\" Date: 05/31/2011
.\" Manual: NUT Manual
.\" Source: Network UPS Tools
.\" Language: English
.\"
.TH "ONEAC" "8" "05/31/2011" "Network UPS Tools" "NUT Manual"
.\" -----------------------------------------------------------------
.\" * Define some portability stuff
.\" -----------------------------------------------------------------
.\" ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
.\" http://bugs.debian.org/507673
.\" http://lists.gnu.org/archive/html/groff/2009-02/msg00013.html
.\" ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
.ie \n(.g .ds Aq \(aq
.el .ds Aq '
.\" -----------------------------------------------------------------
.\" * set default formatting
.\" -----------------------------------------------------------------
.\" disable hyphenation
.nh
.\" disable justification (adjust text to left margin only)
.ad l
.\" -----------------------------------------------------------------
.\" * MAIN CONTENT STARTS HERE *
.\" -----------------------------------------------------------------
.SH "NAME"
oneac \- Driver for Oneac UPS equipment
.SH "NOTE"
.sp
This man page only documents the hardware\-specific features of the oneac driver\&. For information about the core driver, see \fBnutupsdrv\fR(8)\&.
.SH "SUPPORTED HARDWARE"
.sp
This driver supports Oneac EG and ON UPS equipment with the Advanced Interface\&. If your UPS is equipped with the Basic Interface card, use the genericups driver\&.
.SH "EXTRA ARGUMENTS"
.sp
This driver supports the following optional settings in the \fBups.conf\fR(5) file:
.PP
\fBtesttime\fR=\fInum\fR
.RS 4
Change battery test time from the 2 minute default\&.
.RE
.SH "INSTANT COMMANDS"
.sp
This driver supports the following Instant Commands\&.
.PP
\fBreset\&.input\&.minmax\fR
.RS 4
Reset the minimum and maximum input line voltage values seen since the last reset or power on\&.
.RE
.PP
\fBtest\&.battery\&.start\fR
.RS 4
Start a battery test\&. The default time is 2 minutes\&. This time can be set in the
\fBups\&.conf\fR
file\&. See
\fBtestime\fR
above\&.
.RE
.PP
\fBtest\&.battery\&.stop\fR
.RS 4
Stops a battery test that is in progress\&.
.RE
.PP
\fBtest\&.failure\&.start\fR
.RS 4
Starts a 15 second long simulation of an input power failure\&.
.RE
.SH "AUTHOR"
.sp
Eric Lawson <elawson@inficad\&.com>
.SH "SEE ALSO"
.SS "The core driver:"
.sp
\fBnutupsdrv\fR(8)
.SS "Internet resources:"
.sp
The NUT (Network UPS Tools) home page: http://www\&.networkupstools\&.org/